MULTI-SITE PLANNING

Multi-Location Rollout Installation Checklist

Multi-location programs are easier to manage when the installation requirements, material logistics, site access and reporting process are confirmed before the first installer is dispatched.

1. Program Overview

  • Program name

  • Client and project manager

  • Number of locations

  • Provinces and cities

  • Target start and completion dates

  • Required installation sequence

2. Site List

  • Complete address

  • Store or facility contact

  • Phone and email

  • Operating hours

  • Approved installation window

  • Site-specific notes

  • Parking and loading instructions

3. Graphics Package

  • Graphics assigned to each location

  • Artwork proof

  • Dimensions

  • Placement instructions

  • Material specifications

  • Extra or replacement graphics

  • Labelling and packaging requirements

4. Material Distribution

  • Central shipment or direct-to-site delivery

  • Tracking numbers

  • Receiving contacts

  • Storage requirements

  • Confirmation that materials arrived undamaged

  • Process for missing or incorrect graphics

5. Site Readiness

  • Surface condition

  • Existing graphic removal

  • Fixtures or displays that must be moved

  • Construction completion

  • Cleaning or repair requirements

  • Temperature and environmental conditions

6. Access and Equipment

  • Installation height

  • Ladder or lift requirements

  • Security access

  • Work permits

  • Safety orientation

  • After-hours access

  • Second-person requirements

7. Scheduling

  • Confirmed appointment dates

  • Travel routing

  • Regional grouping

  • Store blackout dates

  • Communication process for delays

  • Urgent-change approval process

8. Reporting

  • Required photo angles

  • Before-and-after photos

  • Completion forms

  • Site notes

  • Issue reporting

  • Daily or weekly status updates

  • File-naming requirements

9. Change Management

Damaged surfaces, incorrect graphics, inaccessible areas and site changes should be documented and approved before extra work proceeds.

10. Closeout

  • Final site count

  • Outstanding deficiencies

  • Replacement visits

  • Final photo package

  • Completion confirmation

  • Invoice or purchase-order requirements

Planning a Multi-Location Installation Program?
Send Wicked your site list, graphics package and target schedule. We will review the program and confirm the installation approach.

sales@wickedinstallations.com613-743-3689 · Trenton, Ontario3M Preferred · Working at Heights · MEWP · POST Certified · WSIB · $5M Liability Insurance
© Wicked Installations. All rights reserved.Privacy Policy · Website Terms · Accessibility